HP General IO Connectivity Manual de Instalação Página 11

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 14
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 10
Installation Overview & Planning
Installing HP Fabric Clustering System
Chapter 1
11
Step 5. Fit the sliding rails over the fixed rails with the flanges facing outward until the flanges meet the
rack.
Figure 1-10 Fit Sliding Rail over Fixed Rail
Figure 1-11 Fit Sliding Rail to Rack
Step 6. Attach the rails to the rack, both sides as shown in Figure 1-12.
CAUTION Keep switch supported until rail is attached to the rack.
Figure 1-12 Attach Sliding Rail to Rack
Step 7. Securely attach all rails to the rack.
Vista de página 10
1 2 ... 6 7 8 9 10 11 12 13 14

Comentários a estes Manuais

Sem comentários