Hp ProLiant ML310 G5 Server Manual do Utilizador Página 33

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 32
Hardware options installation 33
5.
Install the optical drive.
6. Connect the power cable to the rear of the drive.
7. Connect the optical drive cable to the rear of the optical drive and to the optical drive cable
connector on the system board.
8. Remove the applicable bezel blank from the bezel ("Remove a bezel blank" on page 20).
9. Install the access panel (on page 19).
10. Install the bezel.
11. Power up the server (on page 17).
USB tape drive
For clarity, the following illustrations include option cabling only.
Vista de página 32
1 2 ... 28 29 30 31 32 33 34 35 36 37 38 ... 98 99

Comentários a estes Manuais

Sem comentários