2 General Site Planning
This chapter provides general recommendations for physical planning and site preparation for
installation and operation of the HP 3PAR S-Class and T-Class Storage systems.
General Planning
Successful installation of HP 3PAR Storage systems requires careful planning and supervision in
collaboration with authorized HP representatives. Proper planning will help provide for a more
efficient installation and greater reliability, availability, and serviceability.
Customer Responsibilities
When planning and preparing for the installation of HP 3PAR Storage systems at a customer site,
the customer assumes the following responsibilities:
Providing suitable space for unpacking, installing and operating the servers
Maintaining the proper environmental conditions for the servers
Providing adequate power facilities for the servers
Supplying the network connections and external cabling required by the servers
Enabling the appropriate HP remote support strategy
The customer is responsible for providing a suitable space and environment for the installation of
the HP 3PAR Storage systems. All pre installation activities should be scheduled and completed
before the equipment is delivered.
Electronic equipment has special packing for shipping and receives special handling during
transportation; the manufacturing environment and packing for shipping are the responsibilities of
3PAR. It is the customer's responsibility to ensure that space is available for unpacking and installing
the new equipment upon delivery.
For optimal performance at a specific location, HP 3PAR Storage systems require controlled
environmental conditions that can best be facilitated through raised flooring and under-floor air
conditioning. It is the customer's responsibility to monitor this environment to ensure continued
conformance with the recommended environmental specifications. Refer to “Structural/Environmental
Considerations” (page 18) for specific information concerning server room environments.
Adequate power is necessary for the reliable functioning of electronic equipment and for the safety
of the customer's installation. The customer is responsible for procuring, installing, and maintaining
adequate power to the equipment. Refer to “Power Requirements” (page 28) for input electrical
power and grounding requirements.
Planning for Installation
The following are suggested site planning considerations to be completed prior to the delivery and
installation of the selected HP 3PAR Storage system.
Prepare a preliminary layout of the subsystem installation.
Review the power and the heating, ventilation, and air-conditioning (HVAC) requirements.
Order any additional support equipment indicated by the power and HVAC review.
Work with the appropriate HP representative to ensure that all system units in the specified
configuration and all cables of the required length have been ordered.
Make a final layout of the installation and review the layout with your HP representative.
Select key personnel and arrange for training with your HP representative.
General Planning 13