HP B6960-96008 Manual do Utilizador Página 221

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 220
Integrating SAP R/3 and Data Protector
Backing Up an SAP R/3 Database
Chapter 2 199
A backup schedule can be tailored according to your business needs. If
you need to keep the database online continuously, then you should back
it up frequently, including backup of the archived redo logs, which is
required in case you need a recovery to a particular point in time.
For example, you may decide to perform daily backups and make
multiple copies of the online redo logs and the Archived Redo Logs to
several different locations.
Some examples of scheduling backups of production databases:
Weekly full backup
Daily incremental backup
Archived Log backups as needed
To schedule an SAP R/3 backup specification, proceed as follows:
1. In the HP OpenView Storage Data Protector Manager, switch to
the Backup context.
2. In the Scoping Pane, expand Backup, Backup Specifications, and
then SAP R/3.
3. Double-click the backup specification you want to schedule and click
the Schedule tab.
4. In the Schedule page, select a date in the calendar and click Add to
open the Schedule Backup dialog box.
5. Specify Recurring, Time options, Recurring options, and
Session options. See Figure 2-14.
Vista de página 220
1 2 ... 216 217 218 219 220 221 222 223 224 225 226 ... 395 396

Comentários a estes Manuais

Sem comentários