Hp 3PAR Application Software Suite for VMware Manual do Utilizador Página 106

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 120
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 105
6.24
Scheduling Virtual Copies
3PAR Management Plug-In and Recovery Manager 2.1.0 for VMware vSphere User’s Guide
Figure 6-31. Successful Creation of Scheduled Task Dialog
A listing for the scheduled task is now shown in the Schedule List.
Figure 6-32. Schedule List with Task
NOTE: If a VM or Datastore is renamed or removed, the associated scheduled
tasks continues to run but is no longer manageable from the 3PAR Management
Plug-in and Recovery Manager for VMware vSphere scheduling interface. In this
case, the task needs to be manually removed from the Windows Scheduler.
NOTE: If the username associated with the user that created a scheduled task
changes, the defined task is no longer operational.
Vista de página 105
1 2 ... 101 102 103 104 105 106 107 108 109 110 111 ... 119 120

Comentários a estes Manuais

Sem comentários