Hp XP P9000 Command View Advanced Edition Software Manual do Utilizador Página 163

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 468
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 162
Scheduling and managing tasks
This module discusses information about tasks and procedures for scheduling and managing tasks:
About tasks, page 163
About task statuses, page 164
About task types (open systems), page 164
About task types (mainframe systems), page 165
Scheduling tasks, page 166
Viewing a list of tasks, page 168
Canceling tasks, page 168
Deleting tasks, page 168
About tasks
A task is a type of operation, such as changing the status of a copy pair or creating a copy pair or
copy group based on a specified schedule. Tasks are managed based on copy groups as functional
units. Multiple tasks created for the same copy group using the Pair Configuration Wizard are
collectively known as associated tasks.
For example, if you create copy groups A and B, which constitute a multi-target configuration, and
copy groups C and D, which constitute a cascade configuration, Replication Manager generates two
tasks, each on a copy group basis, for each workflow.
User Guide 163
Vista de página 162
1 2 ... 158 159 160 161 162 163 164 165 166 167 168 ... 467 468

Comentários a estes Manuais

Sem comentários