Site requirements 10
Top view clearances shown
Side view clearances shown
Adequate space around the HP POD 40c G2 is necessary for airflow and cooling purposes.
These minimum clearances provide room for door opening only. Consider additional space as necessary for
your site.
Safety and clearance area
WARNING: Check for electrical distribution and transmission lines in, over, and under the
construction site and maintain a safe working clearance from energized electrical lines. Consult
your local utility company or AHJ for required clearances.