Hp ProLiant DL380 G7 Server Manual do Utilizador Página 30

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 29
Operations 30
4.
Install the PCI riser cage.
5. Install the access panel (on page 26).
6. Install the server into the rack ("Installing the server into the rack" on page 35).
7. Power up the server (on page 24).
Install the full-length expansion board retainer
1. Power down the server (on page 24).
2. Extend the server from the rack (on page 24).
3. Remove the access panel (on page 25).
4. Install the PCI riser cage (on page 29).
5. Install the full-length expansion board retainer.
6. Install the access panel (on page 26).
Vista de página 29
1 2 ... 25 26 27 28 29 30 31 32 33 34 35 ... 126 127

Comentários a estes Manuais

Sem comentários