Hp ProLiant DL385 G6 Server Manual do Utilizador Página 51

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 50
Hardware options installation 51
10.
Connect any required internal or external cables to the expansion board. See the documentation that
ships with the expansion board.
11. Install the PCI riser cage (on page 23).
12. Install the access panel (on page 22).
PCI riser board option
CAUTION: For proper cooling do not operate the server without the access panel, baffles,
expansion slot covers, or blanks installed. If the server supports hot-plug components, minimize
the amount of time the access panel is open.
1. Power down the server (on page 20).
2. Extend the server from the rack (on page 20).
3. Remove the access panel (on page 21).
4. Remove the PCI riser cage (on page 22).
5. Install the optional riser board.
6. Install any expansion boards. ("Expansion board options" on page 48)
7. Install the PCI riser cage (on page 23).
8. Install the access panel (on page 22).
9. Install the server into the rack.
10. Power up the server (on page 20).
Vista de página 50
1 2 ... 46 47 48 49 50 51 52 53 54 55 56 ... 105 106

Comentários a estes Manuais

Sem comentários