Hp ProLiant SL230s Gen8 Server Manual do Utilizador Página 56

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 55
Hardware options installation 56
o
Right node
10. Install the FBWC capacitor pack into the holder mounted in the server tray.
11. Install the server into the chassis ("Installing the server into the chassis" on page 25).
12. Connect all peripheral cables and power cords to the rear panel.
13. Power up the server (on page 15).
2X LFF Smart Array option
Install this optional cable to use the LFF quick-release hard drive cage with a controller card.
To install the component:
1. Power down the server (on page 15).
2. Remove the server from the chassis (on page 15).
3. Remove the drive air baffle (on page 16).
Vista de página 55
1 2 ... 51 52 53 54 55 56 57 58 59 60 61 ... 109 110

Comentários a estes Manuais

Sem comentários