HP Vectra VEi7 Informações Técnicas Página 51

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 77
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 50
IST-2000-25187
Deliverable D4.3
Evaluation of Phase I Field Trial
TORRENT
IST-2000-25187 PUBLIC Page 51 of 77
F11_Test 1
Support
different user profiles
Phase I user can have different profiles by
changing TOD
Phase II
user can have preferences (selection
according TOD)
Test can't be done.
F12_Test 1
Emergency access to
basic services if main
power fails
Should work ISDN is not ready on
the RGs. The phone is
connected to the NT.
Power failing the RG
doesn't have any
influence to the phone.
F12_Test 2
Acceptable service
selection time
Should work with HTTP
Can be done with Web
service
F12_Test 3 Ease of
installation
Doesn’t make sense now. Some kind of
procedures to perform configuration should be
released by WP2 and WP3
Test can't be done.
F12_Test 5
Reliability
Not to be done. However if possible all field
trials should provide some statistics
concerning failures and on what modules.
Can be done.
From all test situations only access link failure of the ADSL can be detected. They’re 2 different
indications:
LED on the J500 ADSL modem:
Green slow blinking
ADSL not ok: red light
Web server of the modem: ADSL link status information
ADSL link ok: full on
ADSL not ok: wait for activation
This information is from the user site not really helpful. It happened very often that the indication
of the ADSL link is ok but no ATM traffic can be reserved at the LAP site. There is no indication
of this situation.
Vista de página 50
1 2 ... 46 47 48 49 50 51 52 53 54 55 56 ... 76 77

Comentários a estes Manuais

Sem comentários