HP NonStop S Manual do Utilizador Página 390

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 389
FastPath Tasks: Required
HP NonStop S-Series Hardware Installation and FastPath Guide541880-001
E-6
2. Collect Tools
2. Collect Tools
3. Unpack and Unload Server
1. Move each shipping pallet as close as possible to the installation area.
2. If necessary, allow components to warm to room temperature before installation.
This practice reduces condensation that can damage electronic and moving parts.
3. At the installation site, remove all packaging from each enclosure stack.
Object Tools for Installation Purpose
System
enclosure
ESD protection kit Protect components against
electrostatic discharge
Heavy-freight-handling equipment Move shipping pallet to installation site
Safety glasses Protect eyes
Scissors or cutters Cut banding straps
Open-end wrench: 3/4 inch (19
mm) or 9/16 inch (15 mm)
Lower enclosure legs
4 mm diagonal wrench (provided) Unlock system enclosure door
Phillips screwdriver Fasten groundstraps
Stubby Phillips screwdriver Secure AC power cords if present
Labels and pens or pencils Label cables
Tape
subsystem
Open-end wrench: 15/16 inch (24
mm) or adjustable
Lower legs on subsystem enclosure
Small slotted screwdriver Remove shipping restraints if present
Note. One unloading ramp is provided regardless of the number of enclosures shipped.
Figure E-1. Packaging of Enclosure Stack
Cardboard Cap
Cardboard Panel
Antistatic Bag
Cardboard Panel
Plastic Locking Clips
vst987.vsd
Unloading Ramp
Vista de página 389
1 2 ... 385 386 387 388 389 390 391 392 393 394 395 ... 483 484

Comentários a estes Manuais

Sem comentários