HP Server rp8400 Guia de Instalação

Consulte online ou descarregue Guia de Instalação para Servidores HP Server rp8400. HP Server rp8400 Installation Guide Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir

Resumo do Conteúdo

Página 1 - Installation Guide

Installation Guidehp rp8400 Server Series Third EditionVersion 4.0Manufacturing Part Number: A6093-96022 August 2003USA

Página 2 - Legal Notices

10Revision HistoryTable 1 RevisionsEdition Part Number Release Date DescriptionSecond A6093-96012 August 2002 Updated with additions and corrections.T

Página 3 - Contents

11ScopeThe information contained in this manual applies to the hp rp8400 server series. This guide is divided into the following chapters:• Chapter 1

Página 5

13Warnings, Cautions and NotesThis document presents warnings, cautions and notes in the following format.WARNING A warning highlights information th

Página 6

14Safety and Regulatory InformationFor your protection, this product has been tested to various national and international regulations and standards.

Página 7

15EMI Statement (European Union Only)This is a Class A product. In a domestic environment this product may cause radio interference in which case the

Página 8

16In command syntax diagrams, italic identifies variables that must be supplied by the user.Bold In paragraph text, bold identifies either equipment

Página 9

17Associated DocumentsThe following is a list of other documents that provide more details on the topics presented in this manual:• Standard for the

Página 11

Chapter 1191 Introduction This chapter contains a general description of the responsibilities of the Customer and HP Installation Specialist before an

Página 12

2Legal Notices The information in this document is subject to change without notice. Hewlett-Packard makes no warranty of any kind with regard to this

Página 13 - Warnings, Cautions and Notes

Chapter 1IntroductionCustomer Responsibilities20Customer ResponsibilitiesThe customer is responsible for:• Preparing the Site• Accepting the Equipment

Página 14 - FCC Notice

Chapter 1IntroductionHP Installation Specialist Responsibilities21HP Installation Specialist ResponsibilitiesThe HP Installation Specialist is respons

Página 15

Chapter 1IntroductionHP Installation Specialist Responsibilities22CAUTION Do not leave side or top covers off the server for extended periods of time

Página 16

Chapter 2232 Safety ConsiderationsIt is important to observe safety procedures when installing Hewlett-Packard computers and their peripheral devices.

Página 17 - Associated Documents

Chapter 2Safety ConsiderationsInput Power Ratings24Input Power RatingsEach cabinet has a label mounted at the rear of the cabinet that lists its input

Página 18

Chapter 2Safety ConsiderationsInput Power Ratings253. Facility circuit breakers are adequate for specified cabinet current loads. Refer to the Site Pr

Página 19 - 1 Introduction

Chapter 2Safety ConsiderationsElectrical Safety Precautions26Electrical Safety PrecautionsHazardous voltages are present inside the server cabinet whi

Página 20 - Customer Responsibilities

Chapter 3273 Unpacking Inspect shipping containers when the equipment arrives at the site. Check equipment after the packing has been removed. This ch

Página 21 - Installing the Cabinet

Chapter 3Unpacking28NOTE The server will ship in one of three different configurations. The configurations are on a pallet in a Rosebowl II cabinet, o

Página 22

Chapter 3UnpackingInspecting the hp rp8400 Server Cabinet29Inspecting the hp rp8400 Server CabinetHewlett-Packard shipping containers are designed to

Página 23 - 2 Safety Considerations

Contents31. Introduction Customer Responsibilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Página 24 - Input Power Ratings

Chapter 3UnpackingReceiving the hp rp8400 Server Cabinet30Receiving the hp rp8400 Server CabinetThis section contains information pertaining to unpack

Página 25

Chapter 3UnpackingReceiving the hp rp8400 Server Cabinet31Step 3. Remove the corrugated wrap from the pallet.Step 4. Remove the packing materials. CAU

Página 26 - Electrical Safety Precautions

Chapter 3UnpackingReceiving the hp rp8400 Server Cabinet32Step 6. Remove the six bolts from the base attaching the rack to the pallet.Figure 3-3Prepar

Página 27 - 3 Unpacking

Chapter 3UnpackingReceiving the hp rp8400 Server Cabinet33Securing the CabinetOnce in position, secure and stabilize the cabinet using the leveling fe

Página 28

Chapter 3UnpackingRack Mount System Installation34Rack Mount System InstallationServers shipped as a stand alone or in the to be racked configuration

Página 29

Chapter 3UnpackingRack Mount System Installation35This procedure should only be performed by FOUR (4) qualified HP Service Personnel utilizing proper

Página 30

Chapter 3UnpackingRack Mount System Installation36• Installing the ballast kit (J1479A)• Installing the barrel nuts on the front and rear columns• Ins

Página 31

Chapter 3UnpackingRack Mount System Installation37Step 5. Slowly raise the server off the pallet until it clears the pallet cushions.Figure 3-6Raising

Página 32

Chapter 3UnpackingWheel Kit Installation38Wheel Kit InstallationCompare the packing list with the contents of the wheel kit before beginning the insta

Página 33 - Securing the Cabinet

Chapter 3UnpackingWheel Kit Installation391. Cut and remove the polystrap bands securing the HP Server to the pallet.2. Lift the carton top from the c

Página 34 - Manual Lifting

Contents4Verifying Presence of the Cell Boards. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Página 35

Chapter 3UnpackingWheel Kit Installation405. Remove the front cushion only. Do not remove any other cushions until further instructed.Figure 3-8 Remov

Página 36

Chapter 3UnpackingWheel Kit Installation417. Remove two of the eight screws from the plastic pouch. Attach one wheel caster to the front of the server

Página 37

Chapter 3UnpackingWheel Kit Installation4212. Attach the ramp to the edge of the pallet. Note there are two pre-drilled holes in the ramp. Use the tw

Página 38 - Wheel Kit Installation

Chapter 3UnpackingWheel Kit Installation4313. Remove the two side cushions from the server and unfold the cardboard tray so that it lays flat on the p

Página 39

Chapter 3UnpackingWheel Kit Installation4416. Insert the slot on the pedestal cover into the front caster. Secure the pedestal cover to the server by

Página 40

Chapter 3UnpackingWheel Kit Installation4517. Wheel kit installation is complete once both pedestal covers are attached to the server and the bezel co

Página 41

Chapter 3UnpackingPower Distribution Unit46Power Distribution UnitThe server may ship with a 60A Power Distribution Unit (PDU). The NEMA PDU will have

Página 42

Chapter 4474 AC Power Once the system has been unpacked and moved into position, it must be connected to a source of AC power which must be checked be

Página 43

Chapter 4AC Power48• Wiring and Voltage Checks

Página 44

Chapter 4AC PowerOverview49OverviewThe hp rp8400 server series has an AC power plug on a 3-wire AC power cable. These systems connect to a power sourc

Página 45

Tables5Table 1. Revisions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Página 46 - Power Distribution Unit

Chapter 4AC PowerAC Power Connections50AC Power ConnectionsThis section provides a brief overview of concerns to be aware of when attaching the site A

Página 47 - 4 AC Power

Chapter 4AC PowerWiring and Voltage Checks51Wiring and Voltage ChecksThis section details the methods to check wiring and voltage before powering up a

Página 48 - • Wiring and Voltage Checks

Chapter 4AC PowerWiring and Voltage Checks52Verify the connection of the cabinet ground to site AC power ground through a continuity check between the

Página 49 - Overview

Chapter 4AC PowerWiring and Voltage Checks53Voltage Range Verification of Receptacle This procedure measures the voltage between L1 and L2, then from

Página 50 - AC Power Connections

Chapter 4AC PowerWiring and Voltage Checks54Safety Ground Verification (Single Power Source)This procedure measures the voltage level between A0 and A

Página 51 - Wiring and Voltage Checks

Chapter 4AC PowerWiring and Voltage Checks55Safety Ground Verification (Dual Power Source)This procedure measures the voltage level between A0 and A1,

Página 52 - Voltage Check

Chapter 4AC PowerWiring and Voltage Checks56Voltage Check (Additional Procedure)The voltage check ensures that all phases (and neutral, for internatio

Página 53

Chapter 4AC PowerWiring and Voltage Checks57WARNING SHOCK HAZARDRisk of shock hazard while testing primary power.Use properly insulated probes.Be sure

Página 54

Chapter 4AC PowerWiring and Voltage Checks58Regulatory and System Serial Number Label CheckA system serial number is located on the regulatory label a

Página 55

Chapter 5595 System InstallationThis chapter contains the procedures for completing the system installation procedures for the hp rp8400 server series

Página 56

Tables6

Página 57

Chapter 5System Installation60• “Turning On Housekeeping Power and Logging in to the MP”• “Configuring LAN Information for the MP”• “Configuring the M

Página 58

Chapter 5System Installationhp rp8400 Server Series AC Input Power61hp rp8400 Server Series AC Input PowerThe server can receive AC input from two dif

Página 59 - 5 System Installation

Chapter 5System Installationhp rp8400 Server Series AC Input Power62See Figure 5-2 for the graphical representation of how the input power cords suppl

Página 60

Chapter 5System Installationhp rp8400 Server Series AC Input Power63Applying Power to the hp rp8400 Server SeriesInitial observations can be made as t

Página 61

Chapter 5System InstallationSetting Up the CE Tool (PC)64Setting Up the CE Tool (PC) The CE Tool is usually a laptop. It allows communication with the

Página 62

Chapter 5System InstallationSetting Up the CE Tool (PC)65If the CE Tool is a laptop using Reflection 1, check or change these communications settings

Página 63

Chapter 5System InstallationSetting Up the CE Tool (PC)661. Connect one end of a null modem cable (9-pin to 9-pin) (Part Number 5182-4794) to the Loca

Página 64 - Setting Up the CE Tool (PC)

Chapter 5System InstallationTurning On Housekeeping Power and Logging in to the MP67Turning On Housekeeping Power and Logging in to the MPAfter connec

Página 65

Chapter 5System InstallationTurning On Housekeeping Power and Logging in to the MP68• after 30 seconds has elapsed. Note the flashing amber BPS LED fo

Página 66

Chapter 5System InstallationTurning On Housekeeping Power and Logging in to the MP69The MP Main Menu appears:Figure 5-6 MP Main MenuMP login: Admin MP

Página 67

Figures7Figure 2-1. Power Label . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Página 68 - Figure 5-5 BPS LED Location

Chapter 5System InstallationConfiguring LAN Information for the MP70Configuring LAN Information for the MPThis section describes how to set and verify

Página 69 - Figure 5-6 MP Main Menu

Chapter 5System InstallationConfiguring LAN Information for the MP715. Confirm the new address.6. Enter the MP Network Name. This is the host name for

Página 70

Chapter 5System InstallationConfiguring the Management Processor for use with a Web Console72Configuring the Management Processor for use with a Web C

Página 71

Chapter 5System InstallationConfiguring the Management Processor for use with a Web Console73Step 3. Access the Web console by launching a Web browser

Página 72 - Figure 5-9 Example lc Command

Chapter 5System InstallationConfiguring the Management Processor for use with a Web Console74Removing Users - Users can be removed or disabled with th

Página 73 - Figure 5-10 Browser Window

Chapter 5System InstallationVerifying Presence of the Cell Boards75Verifying Presence of the Cell BoardsTo perform this activity, either connect to th

Página 74

Chapter 5System InstallationConfiguring AC Line Status76Configuring AC Line StatusUtilities is able to detect if power is applied to each of the AC in

Página 75

Chapter 5System InstallationPowering On the hp rp8400 Server Series Cabinet (48 V)77Powering On the hp rp8400 Server Series Cabinet (48 V)After poweri

Página 76 - Configuring AC Line Status

Chapter 5System InstallationVerifying the System Configuration78Verifying the System Configuration At this point in the installation process, the hard

Página 77

Chapter 5System InstallationAdding Processors with Instant Capacity On Demand (iCOD)79Adding Processors with Instant Capacity On Demand (iCOD)The Inst

Página 78

Figures8

Página 79

Chapter 5System InstallationBooting HP-UX on the Partition(s)80Booting HP-UX on the Partition(s)To boot HP-UX on a partition:1. At the MP Main Menu, e

Página 80

Chapter 6816 Installation CleanupAfter the hp rp8400 server series has been installed in a computer room and verified, conduct the post installation c

Página 81 - 6 Installation Cleanup

Chapter 6Installation CleanupInstallation Cleanup Checklist82Installation Cleanup ChecklistUse the following list to ensure the system is ready to be

Página 82

Chapter 7837 Returning EquipmentIf damaged equipment is found, use the following procedure to return it to Hewlett-Packard.

Página 83 - 7 Returning Equipment

Chapter 7Returning EquipmentRepacking the Cabinet for Shipment84Repacking the Cabinet for ShipmentUse the original packing material to repackage the s

Página 84

Appendix A85A Installation ChecklistThis section provides a means of tracking progress to ensure that all steps required for a successful installation

Página 85 - A Installation Checklist

Appendix AInstallation ChecklistUsing the Checklist86Using the ChecklistThe checklist provided here is an installation aid and should be used only aft

Página 86 - Using the Checklist

Appendix AInstallation ChecklistUsing the Checklist87Unpack the peripheral cabinet (if ordered)Unpack other equipmentRemove and dispose of packaging m

Página 87 - Installation Checklist

Appendix AInstallation ChecklistUsing the Checklist88Install non-factory-integrated I/O cards (if required)Select PCI card slotInstall PCI cardVerify

Página 88

Appendix B89B Accessing the MP Using a ModemA modem may be used to access the Management Processor (MP) remotely. A modem is often used in conjunction

Página 89

PrefaceThis guide provides the HP Installation Specialist with the background information and procedures needed to install the hp rp8400 server series

Página 90 - Figure B-1 Remote Connection

Appendix BAccessing the MP Using a Modem90To connect the serial display device to the MP using a modem:1. At the side of the SPU cabinet, connect one

Página 91 - Appendix B

Appendix BAccessing the MP Using a Modem91To modify the modem configuration to configure remote login, enter ca (Configure Asynchronous and Modem Para

Página 92

Appendix BAccessing the MP Using a ModemVerifying Modem Communications92Verifying Modem CommunicationsVerify the modem communications using the follow

Página 93

93IndexAac power, 22, 47connections, 50input, 61overview, 49safety warning label check, 58voltage check, 56wiring and voltage checks, 51wiring check,

Página 94

Index94lists, 24login nameMP, 68ls (LAN Status) command, 71MMA (Main Menu) command, 78MAC address, 70Management Processor (MP), 64ME (Memory) command,

Comentários a estes Manuais

Sem comentários