HP Integrity NonStop Release and Migration Manual do Utilizador Página 69

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 320
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 68
G06.24 Upgrade Checklists
G06.24 Software Installation and Upgrade Guide528593-005
2-3
G06.24 Upgrade Checklist
27. Configure the Spooler (if
necessary)
2 minutes Configure the Spooler on
page 12-9
28. Start system and
application software
11 minutes Start User and System
Applications on page 12-10
29. Reset and start the
system mirror disk (if
necessary)
2 minutes
(not including
the REVIVE)
Reset and Start the Mirror System
Disk (If Necessary) on page 12-11
30. Configure OSS (if
necessary)
20 minutes
***
Configure OSS on page 12-13
31. Configure SMF (if
necessary)
60 minutes Configure SMF (Optional)
on
page 12-14
32. Configure RDF (if
necessary)
5 minutes Configure the Remote Duplicate
Database Facility (RDF) on
page 12-15
33. Install, and configure
OSM client-based
components and server
(if not done in Step 12)
20 minutes** See the OSM Migration Guide and
support note S03133A.
* Duration is dependent upon the SPRs (if any) you need to install.
**Duration is dependent upon selected TSM or OSM installation and configuration options.
***Duration of each remaining task dependent upon what products are installed on your system
*
**
***
Table 2-1. G06.24 Upgrade Checklist (page3of3)
Task Description
Minimum
Duration Documentation
Done
?
Vista de página 68
1 2 ... 64 65 66 67 68 69 70 71 72 73 74 ... 319 320

Comentários a estes Manuais

Sem comentários