Hp Hitachi Dynamic Link Manager Software Manual do Utilizador Página 230

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 229
4. HDLM Operation
208
12. Go back to the PCI Hot Plug Manager window, select Replace/Remove a PCI
Hot Plug Adapter.
Select the HBA to be replaced.
13. Select Replace in the input field.
14. When the following message is displayed, replace the HBA:
When you finish replacing the HBA, connect the cable and press Enter.
15. Execute the following command to reconfigure the device:
# cfgmgr -l fcs
n
To reconfigure the device, specify the device name of the PCI slot where the HBA
was replaced (
fcs device); n indicates the instance number of the fcs device.
16. If LUN security has been set up for the storage system, delete the WWN of the
previous HBA from the LUN security.
17. Execute the following command to check the path information:
# /usr/DynamicLinkManager/bin/dlnkmgr view -path
For details about the path information, see 6.7 view (Displays Information).
Notes
If you replace all HBAs for a volume group without following the above
Vista de página 229
1 2 ... 225 226 227 228 229 230 231 232 233 234 235 ... 509 510

Comentários a estes Manuais

Sem comentários