Hp Integrity BL870c Server-Blade Manual do Utilizador Página 47

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 47
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 46
Index
A
Air conditioning, 11
Anchor holes
,marking concrete floor, 20
drilling into concrete floor, 20
tools required, 19
C
Communications interference, 13
Cooling assessment, 11
D
Dust and microscopic particles, 13
E
Electrostatic discharge, 14
F
Floor anchoring, 19
Flooring, 12
G
Ground cables
and star washers, 38
inside seismic rack, 38
H
Hot spots, 11
M
Metallic particulate contamination, 13
O
Operational space, 12
P
Particulates, metallic, 13
R
Rack see seismic rack
Raised floors, requirements for, 12
Receiving and unpacking, 12
S
Seismic rack
anchoring to floor, 19
bolting to the floor, 31
casters, 26
door, 22
eyebolts, 26
ground cables
internal, 38
ground connections, 16
grounding, 36
grounding rails, 16, 38
kickplate, 24
payload limit, 9
positioning, 30
side panels, 24
specifications, 15
unpacking, 22
Site ground, 36
Site power cables
reference documentation, 46
requirements, 46
Specifications
environmental, 15
rack, 15
Star washers
and ground cables, 38
T
Tools
for connecting cables, 17
for installing cabinets, 17
W
Weight calculation, 12
Z
Zinc, cadmium, or tin particulates, 13
47
Vista de página 46
1 2 ... 42 43 44 45 46 47

Comentários a estes Manuais

Sem comentários