HP 10-Base-T Manual de Instalação Página 31

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 30
2-7
Troubleshooting
Troubleshooting
Running Connectivity Tests
Both the hub and cabling can be tested by running an end-to-end communica-
tions test—a test that sends known data from one network device to another
through the hub—such that you can verify that the data was correctly trans-
mitted between the devices. Through both the ASCII Console Interface and
the Browser Interface, you can run the following hub-to-node connectivity
tests:
Link Test. A test of the link layer (MAC Address) connection between a local
device and a designated remote device.
Ping Test. A test of the network layer (IP Address) path between the managed
device and another device on an IP network that responds to IP packets.
Figure 2-2. Running a Connectivity Test
See your LAN adapter’s manual for information on running an end-to-end
communication test.
PC responding to
the test packets
PC sending
test packets
Vista de página 30
1 2 ... 26 27 28 29 30 31 32 33 34 35 36 ... 53 54

Comentários a estes Manuais

Sem comentários