Standard Operation Procedure JAN Process: Rework
Item Name Q'ty Item Version Issue Date Difference
1
INVERTER BOARD 1
1
DVT-R00 2008/2/14 Initial
2 2
3
CABLE 8P TO 6P/3P,L:320mm 1
3
4 4
5 SCREW M3*5L (P) W-ZN #2 4 5
6 6
Item Name Q'ty Item Version Issue Date Difference
1
#2 (5.0±0.5kgf/cm ) 1
2
3
第
31
頁
4
共
63
頁
Form NO.:ISZ-5P5001-001 Rev.01(C)
Action disassemble INVERTER&tear tape
页碼
electric screw driver
P/N
14G030036700H2
S:14G030036701H2
13GMAP4F050S
Model:
P/N
Pegatron 文號
PM3-00601-C7H002
04G550281000H2
S:04G550281100H2
Pull out inverter cable vertically.
Note:Don't dmage
cable&connector.
3
Take inverter.
Note:Don't dmage component.
Disassemble 4 screws on inverter vertically.Put
them in screw box.
Note:Don't mix screw.
1
2
3
4
21
4
Tear tape on inverter board
cable,put it in discarding box(as red
part).
Note:Don't make tape fall off in unit.