
Standard Operation Procedure JAN Process: Rework
Item Name Q'ty Item Version Issue Date Difference
1
SCREW M3*4L (B) W-ZN #2 4
1
DVT-R00 2008/2/14 Initial
2 2
3 3
4 4
5 5
6 6
Item Name Q'ty Item Version Issue Date Difference
1
#2 (5.0+/-0.5kgf/cm) 1
2
3
第
45
頁
4
共
63
頁
Form NO.:ISZ-5P5001-001 Rev.01(C)
Action disassemble LCD
页碼
electric screw driver
P/N
Model:
P/N
Pegatron 文號
PM3-00601-C7H002
13GMAB4F040S
Two operator disassemble 2 screw on Base pan left/right
side,put screws in screw box.
Note:Don't make screws mixed.Diassembling order :first one
next to foot (circle2),second one is on LCD (circle1).
2
1
12
right
left 2
1
12
right
left
12
right
1
Two operator hold base pan,route inverter cable&FFC cable
through corresponding base pan hole,then separate base pan
and LCD.
Note:Don't scratch cable.
2
Comentários a estes Manuais