
Standard Operation Procedure JAN Process: Rework
Item Name Q'ty Item Version Issue Date Difference
1
SCREW M3*5L (P) W-ZN #2 2
1
DVT-R00 2008/2/14 Initial
2
JAN_AMP_BOARD_SHIELDING 1
2
3 3
4 4
5 5
6 6
Item Name Q'ty Item Version Issue Date Difference
1
#2-6(5.0+/-0.5kgf/cm) 1
2
3
第
5
頁
4
共
63
頁
Form NO.:ISZ-5P5001-001 Rev.01(C)
Action disassemble AMP SHIED
页碼
electric screw driver
P/N
Model:
P/N
Pegatron 文號
PM3-00601-C7H002
13GMAP4F050S
13GP1570M240-1H2
Pull aparts all hooks on plastic of main
rear cover.Attention: 1.Pull apart from
down to up.2.Do not break hooks.3.Do
not scratch rear cover.
1
1
2
4
3
Tear two cable routing tape as picture.
1
2
2
1.Remove AMP SHIED as picture.
2.Put AMP SHIED in the material box
Attention: Do not scratch AMP SHIED
rear cover.
4
Disassemble 2 AMP Board shield
screws vertically and place them in the
box.
Attention: Do not mix screws
1
2
3
Comentários a estes Manuais