Hp Array Controller HSG V8.7 Software Manual do Utilizador Página 181

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 206
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 180
Assembling an UltraSCSI RAID Subsystem
UltraSCSI RAID Enclosure B–9
Installing the Power System
The ac input boxes and shelf power supplies comprise the enclosure
power system (see Figure B–4).
Figure B–4 Enclosure Power System
Caution
To protect this sensitive electronic device from ESD, use the
following precautions:
Wear an ESD wrist strap.
Do not touch the printed circuit board or the backplane
connector.
Do not lay the device on a work surface; place it on an
electrostatic mat.
Place the device in an electrostatic bag for shipment.
To prevent ESD damage to a power supply SBB, do not
touch the SBB connector.
The sequence for installing the power system is as follows:
1. Install the shelf power supplies using Table 6–4, steps 1
through 4.
2. Install the ac input boxes using Table 6–6, steps 1 through 7.
CXO5800A
Vista de página 180
1 2 ... 176 177 178 179 180 181 182 183 184 185 186 ... 205 206

Comentários a estes Manuais

Sem comentários