Hp Hitachi Dynamic Link Manager Software Manual do Utilizador Página 152

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 151
3. Creating an HDLM Environment
128
16. For Device Hardware ID, enter DGC RAID, and then click the OK button.
Enter five single-byte spaces between
DGC and RAID.
17. Click the OK button to close the MPIO Properties dialog box.
18. Shut down the host.
Leave the host in a single-path configuration until you check (in step 26) whether
HDLM has been successfully installed.
19. Perform steps 3 to 18 on all the hosts that make up the cluster system.
20. Make sure that all the hosts in the cluster system have completely shut down.
21. Restart each host.
22. Log on to Windows again as a member of the Administrators group.
23. Execute the
dlnkmgr command's view operation to display the status of each
program.
An example of executing the
dlnkmgr command's view operation is as follows:
>dlnkmgr view -sys
HDLM Version : x.x.x-xx
Service Pack Version :
Load Balance : on(extended lio)
Support Cluster : off
Elog Level : 3
Elog File Size (KB) : 9900
Number Of Elog Files : 2
Trace Level : 0
Trace File Size(KB) : 1000
Number Of Trace Files : 4
Path Health Checking : on(30)
Auto Failback : on(1)
Remove LU : off
Intermittent Error Monitor : off
HDLM Manager Ver WakeupTime
Alive x.x.x-xx yyyy/mm/dd hh:mm:ss
HDLM Alert Driver Ver WakeupTime ElogMem Size
Alive x.x.x-xx yyyy/mm/dd hh:mm:ss 128
HDLM Driver Ver WakeupTime
Alive x.x.x-xx yyyy/mm/dd hh:mm:ss
License Type Expiration
Permanent -
KAPL01001-I The HDLM command completed normally. Operation
name = view, completion time = yyyy/mm/dd hh:mm:ss
Vista de página 151
1 2 ... 147 148 149 150 151 152 153 154 155 156 157 ... 491 492

Comentários a estes Manuais

Sem comentários