Hp ProLiant ML310 G5p Server Manual do Utilizador Página 34

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 33
Hardware options installation 34
10.
Power up the server (on page 16).
Full-height tape drive
For clarity, the following illustrations include option cabling only.
To install the component:
1. Power down the server (on page 16).
2. Remove the bezel (on page 17).
3. Remove the access panel (on page 18).
4. Remove the applicable media bay blanks ("Remove a media bay blank" on page 19).
5. Disengage the two wire supports inside the half-height drive bays.
6. Install the tape drive:
a. Open the upper and lower wire retainers.
b. Install the full-height tape drive.
Vista de página 33
1 2 ... 29 30 31 32 33 34 35 36 37 38 39 ... 102 103

Comentários a estes Manuais

Sem comentários