HP SuperStack 3 Load Balancer Appliance Manual do Utilizador Página 21

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 99
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 20
The Power-up Sequence 21
The Power-up
Sequence
The following sections describe how to get your Server Load Balancer
powered-up and ready for operation.
WARNING: If you are connecting the Server Load Balancer to a ARPS
Type 3 Power Module, read the Safety Information section in the
documentation shipped with the power system.
Powering-up To power-up the Server Load Balancer, complete the following steps:
1 Plug the power cord into the power socket at the rear of the unit.
2 Plug the other end of the power cord into your power outlet.
The unit powers-up and runs through its Power On Self Test (POST),
which takes approximately 10 seconds.
During the POST, all ports on the Server Load Balancer are disabled and
the LEDs light in a rapid sequence. See LEDs on page 14.
When the POST has completed, check the Power/Self Test LED to make
sure that your Server Load Balancer is operating correctly. See Solving
Problems Indicated by LEDs on page 22.
slb_gsg.bk Page 21 Thursday, May 31, 2001 8:57 AM
Vista de página 20
1 2 ... 16 17 18 19 20 21 22 23 24 25 26 ... 98 99

Comentários a estes Manuais

Sem comentários