2-21
Installing the Switch
Installation Procedures
Routing a power cord. Figure 10 shows different ways in which you can
route a power cord through the plenum in a power-side mounting.
Figure 2-20. Routing a Power Cord Through the Front of the Plenum or Up and Over
the Switch
Installing an Air Plenum. Be sure to use the correct plenum for the size of
the 6600 Switch being installed. The plenum comes in two sizes. Both plenums
are installed in the same way.
■ J9480A is the shorter air plenum for 6600-24XG, 6600-48G, and 6600-
48G-4XG Switches.
■ J9481A is the longer air plenum for 6600-24G and 6600-24G-4XG
Switches.
Slide the plenum into the rails until the plenum is fully inserted and the
mounting hole on each side lines up with the with the cage nut in the rack
post.
Route the power cord through the
front groove in the plenum.
Route the power cord through the plenum opening,
and up and over the switch in either a single- or
stacked-switch installation.