Facility planning for implementation 52
The following figure shows the recommended facility piping approaches to the MCS-200/100.
Item Description
1
Preferred piping location: locate chilled water piping taps
behind the MCS-200/100—either under or above the
floor. Chilled water taps must approach laterally.
2
Do not locate piping connections or components under the
MCS-200/100.
3
Alternate piping location: locating chilled water piping
taps in front of the MCS-200/100. Under the floor is
possible. This option requires careful planning due to the
chilled water hose length limitation.
Hose openings
The following figures show the dimensions and locations of the various hose openings of the MCS-200/100.
MCS-100 hose openings