HP Vectra 520 Guia de Instalação Página 146

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 503
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 145
Hardware installation: Intelligent Peripheral Equipment module 4-39
Meridian MAX
Installation Guide
Product release 8
Figure 4-12
Cabling arrangement—Meridian MAX IPE/IPE-E NT1R03Ex straight through RS-232
extension cable used between NT1R03AA or NT1R03BA and peripheral devices
2
3
4
5
6
7
8
15
RTS
CTS
DSR
GND
CD
SCT
17
20
24
SCR
DTR
SCTE
2
3
4
5
6
7
8
15
17
20
24
RTS
CTS
DSR
GND
CD
SCT
SCR
DTR
SCTE
(DB-25)
Female
TD
RDRD
TD
(DB-25)
Male
DB-25 cable
(NT1R03EB, 62 cm [2 ft])
(NT1R03EC, 1.2 m [4 ft])
(NT1R03EF, 3 m [10 ft])
(NT1R03EP, 7.6 m [25 ft])
(NT1R03EV, 13.7 m [45 ft])
Note:
Pins 1, 9–14, 16, 18, 19, 21–23, and 25 carry no signal and are not used with this cable.
Vista de página 145
1 2 ... 141 142 143 144 145 146 147 148 149 150 151 ... 502 503

Comentários a estes Manuais

Sem comentários